This site is not maintained anymore. Please move to MHWiki.org
Difference between revisions of "Hydraulic Network"
From Die2Nite Wiki
m (moved Workshop (Hydraulic Network) to Hydraulic Network over redirect: Name changed back) |
|||
| Line 15: | Line 15: | ||
*In [[Season 3]], the Hydraulic Network was renamed Workshop, and the image [[File:item_tube.gif]] was replaced with [[File:item_firework_tube.gif]]. | *In [[Season 3]], the Hydraulic Network was renamed Workshop, and the image [[File:item_tube.gif]] was replaced with [[File:item_firework_tube.gif]]. | ||
*After community intervention it was once more renamed and the building returned to it's proper name - Hydraulic Network. | *After community intervention it was once more renamed and the building returned to it's proper name - Hydraulic Network. | ||
| + | *In Season 4 n&b cost was dropped from 5 to 3 | ||
{{Construction Sites}} | {{Construction Sites}} | ||
Revision as of 22:38, 23 November 2011
| Hydraulic Network |
|
| Thanks to this network of pipes, you can build powerful water-based defences. Furthermore, this system adds a little extra water to the well. | |
| Category | Buildings |
| Sub Category | Pump |
Not to be confused with Workshop.
Allows the building of some defense buildings and adds 15 water to the well.
Depends on
Unlocks
Notes
- In Season 3, the Hydraulic Network was renamed Workshop, and the image
was replaced with
. - After community intervention it was once more renamed and the building returned to it's proper name - Hydraulic Network.
- In Season 4 n&b cost was dropped from 5 to 3